Falcon 9 Block 5 | Lunar Trailblazer & Nova-C IM-2

Falcon 9 Block 5 | Lunar Trailblazer & Nova-C IM-2

Launch Complex 39A
Kennedy Space Center, FL, USA

T?

--

Days

:

--

Hours

:

--

Mins

:

--

Secs

Date Loading...
Trajectory

SpaceX

Space Exploration Technologies Corp., known as SpaceX, is an American aerospace manufacturer and space transport services company headquartered in Hawthorne, California. It was founded in 2002 by entrepreneur Elon Musk with the goal of reducing space transportation costs and enabling the colonization of Mars. SpaceX operates from many pads, on the East Coast of the US they operate from SLC-40 at Cape Canaveral Space Force Station and historic LC-39A at Kennedy Space Center. They also operate from SLC-4E at Vandenberg Space Force Base, California, usually for polar launches. Another launch site is being developed at Boca Chica, Texas.

Website

Nova-C IM-2

This is the second mission of Nova-C lunar lander developed and built by Intuitive Machines. This time it carries a NASA payload called PRIME-1 (Polar Resources Ice Mining Experiment-1), which is to be the first demonstration of in-situ resource utilization on the Moon. PRIME-1 consists of two instruments: TRIDENT drill and Msolo mass spectrometer.

info More Information

Falcon 9 Block 5


Height 70.00 Meters

Max Stages 2

Mass To GTO 8300 kg

Liftoff Thrust 7607 kN

Diameter 3.65 Meters

Mass To LEO 22800 kg

Liftoff Mass 549 Tonnes


Launch Success 343

Consecutive Success 46

Maiden Flight 2018-05-11

Launch Failures 1


Wiki

Updates

Cosmic_Penguin

2024-11-14T14:12:00+0000

NET February.

Source

Nosu

2024-09-13T06:39:00+0000

Targeting between January 1 and January 5, 2025

Source

Cosmic_Penguin

2024-07-09T09:58:12+0000

NET December 2024.

Source

Cosmic_Penguin

2024-02-24T07:30:25+0000

NET Q4 2024.

Source

Nosu

2022-06-24T11:58:41+0000

NET mid-2023

Source

Related News

2024-10-29T15:58:00+0000

NASA

How NASA’s Lunar Trailblazer Could Decipher the Moon’s Icy Secrets

2024-09-12T17:35:41+0000

SpaceNews

Ice-hunting Lunar Trailblazer and IM-2 nearly ready for January 2025 launch

2024-05-14T14:57:13+0000

SpaceNews

Intuitive Machines making upgrades to second lunar lander

2023-11-14T08:44:10+0000

SpaceNews

Intuitive Machines planning up to three lunar lander missions in 2024

2023-07-11T18:30:05+0000

Arstechnica

Here come the Moon landing missions (probably)

2023-01-24T23:36:03+0000

Teslarati

SpaceX to launch asteroid mining spacecraft alongside private Moon lander

2022-11-10T13:09:13+0000

SpaceNews

NASA to continue Lunar Trailblazer despite cost overrun

See More News