Days
Hours
Mins
Secs
The Navy was competed with the Army to put the first American satellite into orbit. Their first two Vanguard missions failed, with the second being a highly publicized failure, as it exploded on the launchpad. They went on to put 3 satellites into orbit but did not beat the Army to be the first. Their work in space continues today largely on military satellites.
The project pilot payloads were small cylindrical satellites. These missions intended to be the first to launch a satellite from an aircraft. They had only a single instrument, a very primitive infrared line scanning device to make IR images of the ground.
Height 4.40 Meters
Max Stages 5
Mass To GTO 0 kg
Liftoff Thrust 125 kN
Diameter 0.76 Meters
Mass To LEO 1 kg
Liftoff Mass 0 Tonnes
Launch Success 0
Consecutive Success 0
Maiden Flight 1958-07-04
Launch Failures 6