Days
Hours
Mins
Secs
STS-126 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. The purpose of the mission, referred to as ULF2 by the ISS program, was to deliver equipment and supplies to the station, to service the Solar Alpha Rotary Joints (SARJ), and repair the problem in the starboard SARJ that had limited its use since STS-120.
Serial OV-105
Launch Crew Count 0
Status Retired
Landing Time 2008-11-30T21:25:00+0000
Height 56.10 Meters
Max Stages 2
Mass To GTO 0 kg
Liftoff Thrust 28200 kN
Diameter 8.00 Meters
Mass To LEO 27500 kg
Liftoff Mass 2030 Tonnes
Launch Success 133
Consecutive Success 22
Maiden Flight 1981-04-12
Launch Failures 2